Knowledge Center

My Saved Articles
Back

Phase I Statistical Process Control Charts: An Overview and Some Results

Quality Engineering vol. 21 issue 1 - January 2009

Abstract:[This abstract is based on the authors' abstract.] An overview is given of the literature on Phase I parametric control charts for univariate variables data. When designing the charts, the joint distribution of the charting statistics is used to control the false alarm probability. An example is given and suggestions are made concerning future research problems.

Keywords: Exponential distribution; False alarm rate (FAR); Normal distribution; Variance (statistics)

    
Already a member/subscriber? Download the PDF.

You will need Adobe Reader to view this PDF document.
Download the free Reader from Adobe


  • Print this page
  • Save this page

Average Rating

Rating

Out of 0 Ratings
Rate this article

View comments
Add comments
Comments FAQ

Boston University
2010 World Conference on Quality and Improvement
ASQ On-Demand Training Collection
ASQ Learning Institute
Lean Six Sigma for Healthcare
ASQ Careers