|
| Membership
ASQ is the leading source for quality tools and processes to help professionals at all levels, and in all industries. An individual membership with ASQ will provide you with the people, resources and best practices to deepen your understanding of process improvement and other quality tools necessary to help achieve your goals and surmount any challenges you may face on your road to excellence.
Are you an inspiration to your organization, the flame that ignites quality within? ASQ offers a membership level just for organizations, regardless of their size. A sustaining membership with ASQ allows your company access to the worldwide quality community, making you stand out amongst your peers.
- Estimating a Proportion Using Stratified Data From Both Convenience and Random Samples - Graves, Todd; Hamada, Michael; Booker, Jane; Decroix, Michele; Chilcoat, Kathy; Bowyer, Clint (25-Jun-07)
- A Multivariate Change-Point Model for Statistical Process Control - Zamba, K.D.; Hawkins, Douglas M. (01-Nov-06)
- On Estimating Linear Relationships When Both Variables Are Subject to Heteroscedastic Measurement Errors - Cheng, Chi-Lun; Riu, Jordi (01-Nov-06)
- Using a Fractional Factorial Design to Increase Direct Mail Response at Mother Jones Magazine - Ledolter, Johannes; Swersey, Arthur J. (01-Oct-06)
- Effects of Parameter Estimation on Control Chart Properties; A Literature Review - Jensen, Willis A.; Jones-Farmer, L. Allison; Champ, Charles W.; Woodall, William H. (01-Oct-06)
- Extreme (X-) Testing With Binary Data and Applications to Reliability Demonstration - Mease, David; Nair, Vijayan N. (01-Aug-06)
- Evaluating and Implementing 3-Level Control Charts - Cassady, C. Richard; Nachlas, Joel A. (01-Jul-06)
- A Neural Network-Based Approach for Statistical Probability Distribution Recognition - Su, C.-T.; Chou, C.-J. (01-Jul-06)
- A Bayesian Analysis of the Deming Cost Model with Normally Distributed Sampling Data - Chyu, Chiuh-Cheng; Yu, I-Chung (01-Apr-06)
- Acceptance Sampling? The Enterprise Strikes Back! AS9100 c = 0 Plans; when Slogans Supplant Science - Maciulla, Joe (01-Apr-06)
- A Note on Sample Size Determination for a Nonparametric Test of Location - Chakraborti, S.; Hong, B.; van de Wiel, M.A. (01-Feb-06)
- A Control Scheme for High-Yield Correlated Production Under Group Inspection - Tang, Loon-Ching; Cheong, Wee-Tat (01-Jan-06)
- Quantile-Based Metrics Applied to Process Performance - Houston, Ben F. (01-Oct-05)
- Multivariate Monitoring Using an MEWMA Control Chart with Unequal Sample Sizes - Kim, Keunpyo; Reynolds, Marion R. (01-Oct-05)
- A Modified Acceptance Test Model with Particular Applicability to Bioassay Systems - Halperin, Gideon (01-Oct-05)
- Average Run Length and the OC Curve of Sampling Plans - Schilling, Edward (01-Jul-05)
- Kano's Theory of Attractive Quality and Packaging - Lofgren, Martin; Witell, Lars (01-Jul-05)
- VSP Software for Collaborative Sampling and Decision Making - McKinstry, Craig A.; Gilbert, Richard O.; Pulsipher, Brent A.; Wilson, John E. (01-May-05)
- Statistical Process Control for Shifts in Mean or Variance Using a Changepoint Formulation - Hawkins, Douglas M.; Zamba, K.D. (01-May-05)
- Sample Size and Number of Failure Requirements for Demonstration Tests With Log-Location-Scale Distributions and Failure Censoring - McKane, Scott W.; Escobar, Luis A.; Meeker, William Q. (01-May-05)
- Power Computations for Intervention Analysis - McLeod, A.I.; Vingilis, E.R. (01-May-05)
- Capability Indexes: Mystery Solved - Roth, Gregory (01-May-05)
- A Game Theory Application in Robust Design - Arthanari, T.S. (01-Apr-05)
- Multivariate Monitoring of the Process Mean Vector With Sequential Sampling - Reynolds, Marion R.; Kim, Keunpyo (01-Apr-05)
- A Control Chart Based on Sample Median for the Detection of a Permanent Shift in the Process Mean - Khoo, Michael B. (01-Apr-05)
- Interval Estimation for the Smaller-the-Better Type of Signal-to-Noise Ratio Using Bootstrap Method - Chou, Chao-Yu; Chen, Chung-Ho; Liu, Hui-Rong (01-Jan-05)
- Optimal Progressive Censoring Plans for the Weibull Distribution - Ng; H.K.T.; Chan, P.S.; Balakrishnan, N. (01-Nov-04)
- Should Observations Be Grouped for Effective Process Monitoring? - Reynolds, Marion R.; Stoumbos, Zachary G. (01-Oct-04)
- A Two-Sample Test for Reliability Comparison - Sirvanci, Mete (01-Jun-04)
- An Application and Use of Economic and Statistical X-Bar Control Chart Design for the Textile Yarn Industry - Engin, A. Baki (01-Jun-04)
- Control Charts and the Efficient Allocation of Sampling Resources - Reynolds, Marion R., Jr.; Stoumbos, Zachary G. (01-May-04)
- The Effect of Pooled and Un-pooled Variance Estimators of C(pm) When Using Subsamples - Hubele, Norma Faris; Vannman, Kerstin (01-Apr-04)
- Economic Design of CSP-1 Plan Under the Dependent Production Process and Linear Inspection Cost - Chen, Chung-Ho; Chou, Chao-Yu (01-Dec-03)
- Multidimensional Mixed Sampling Plans - Suresh, K.K.; Devaarul, S. (01-Dec-03)
- Study on Implementing Control Charts Assuming Negative Binomial Distribution with Varying Sample Size in a Software Industry - Das, Nandini (01-Dec-03)
- Characterizing Performance Variation of Product Designs - Lulu, Menberu (01-Sep-03)
- Column: Statistics Roundtable: n (How many samples do you need to take?) - Hare, Lynne B. (01-Aug-03)
- Bayesian Software Reliability Models Based on Martingale Processes - Basu, Sanjib; Ebrahimi, Nader (01-May-03)
- Evaluating and Implementing 3-Level Acceptance Sampling Plans - Cassady, C. Richard; Nachlas, Joel A (01-Mar-03)
- Model-Robust Test Plans with Applications in Accelerated Life Testing - Pascual, Francis G.; Montepiedra, Grace (01-Feb-03)
- The Advantages of Continuous Measurements over Pass/Fail Data - Hamada, Michael (hamada@lanl.gov) (01-Dec-02)
- On the Performance of Geometric Charts with Estimated Control Limits - Yang, Zhenlin; Xie, Min; Kuralmani, Vellaisamy; Tsui, Kwok-Leung (01-Oct-02)
- Modeling Errors in Sampling Inspection; Effect of Degraded Performance - Jiang, Xiaochun; Srinivasan, Arun; Gramopadhye, Anand K.; Ferrell, William G. (01-Sep-02)
- Designing and Selection of Mixed Sampling Plan with Chain Sampling as Attribute Plan - Suresh, K.K.; Denaarul, S. (01-Sep-02)
- Lot Acceptance and Compliance Testing Using the Sample Mean and an Extremum - Vangel, Mark G. (01-Aug-02)
- Improved Control Charts for Attributes - Laney, David B. (01-Jun-02)
- Virtual Inspection: Optimum Sample Size for POD Experiment - Song, Xiaolan; Sarkar, Pradipta; Veronesi, William (01-Jun-02)
- The COTS Software Quality Challenge - Voas, Jeffrey (01-May-02)
- Exact Analysis of Means With Unequal Variances - Nelson, Peter R.; Dudewicz, Edward J. (01-May-02)
- Monitoring of a Batch Continuous Process Using Mass Re-Sampling - Martin, E.B.; Bettoni, A.; Morris, A.J. (01-Apr-02)
- Safety Sampling: A Case Study - Gitlow, Howard S.; Berkins, Alayne R.; He, Min (01-Mar-02)
- Minimum Average Total Inspection Plans for Variables Sampling, Indexed by Average Outgoing Quality Limit - Schilling, Edward G.; Sheesley, John H.; Anselmo, Kenneth J. (01-Mar-02)
- Column: Statistics Roundtable: Shewhart Charts And Serially Recorded Data - Hunter, J. Stuart (01-Feb-02)
- Acceptance Sampling With Rectification When Inspection Errors Are Present - Anderson, Michael T.; Greenberg, Betsy S.; Stokes, S. Lynne (01-Oct-01)
- The Optimum Target Value Under Single and Two-Stage Screenings - Lee, Min Koo; Hong, Sung Hoon; Elsayed, Elsayed A. (01-Oct-01)
- Some New Classroom Cases for Teaching Statistical Quality Control Methods - van Delft, Christian (01-Sep-01)
- Prediction of Yield in a Multiproduct Batch Production Environment - Joseph, V. Roshan; Adya, Harsha (01-Sep-01)
- Multivariate Outlier Detection and Robust Covariance Matrix Estimation, with Discussions and Response - Pena, Daniel; Prieto, Francisco J.; Rocke, David M.; Woodruff, David L.; Hubert, Mia (01-Aug-01)
- A Simple General Method for Constructing Confidence Intervals for Functions of Variance Components - Chiang, Andy K. L. (01-Aug-01)
- The Performance of Multivariate Control Charts in the Presence of Measurement Error - Linna, Kenneth W.; Woodall, William H.; Busby, Kevin L. (01-Jul-01)
- Detecting Over Rejection in Testing of Integrated Circuits - Chang, T.C.; Gan, F.F. (01-Jul-01)
- Confidence Interval Coverage for Designed Experiments Analyzed with GLMs - Lewis, Sharon L.; Montgomery, Douglas C.; Myers, Raymond H. (01-Jul-01)
- Adaptive quality-Control Strategy for Progressive Reduction of the Amount of Inspection Required - Bechard, Bruno-Marie; Thibault, Marc-Eric (01-Jun-01)
- Credit in Acceptance Sampling on Attributes - Klaassen, Chris A.J. (01-May-01)
- Content-Corrected Tolerance Limits Based on the Bootstrap - Fernholz, Luisa; Gillespie, John A. (01-May-01)
- 10 Requirements for Effective Process Control: A Case Study - Little, Thomas A. (01-Feb-01)
- Small Sample Properties of an Adaptive Filter Applied to Low Volume SPC - Crowder, Stephen V.; Eshleman, Larry (01-Jan-01)
- Power Curves for the Analysis of Means for Variances - Wludyka, Peter S.; Nelson, Peter R.; Silva, Peter R. (01-Jan-01)
- Variable Selection in Product Design - Kanyamibwa, Felicien; Christy, David P.; Fong, Duncan K.H. (01-Jan-01)
- Using Ranges to Estimate Variability - Woodall, William H.; Montgomery, Douglas C. (01-Dec-00)
- Developing Control Charts and Illustrating Type I and Type II Errors - Umble, Elisabeth J.; Umble, M. Michael (01-Oct-00)
- Economic and Economic Statistical Designs for MEWMA Control Charts - Linderman, Kevin; Love, Thomas E. (01-Oct-00)
- Control Chart for Markov-Dependent Sample Size - Sivasmay, R.; Subramanian, C. (01-Jun-00)
- Blocking Multiple Sources of Error in Small Analytic Studies - Leon, Ramon V.; Mee, Robert W. (01-Jun-00)
- Progressively Censored Reliability Sampling Plans for the Weibull Distribution - Balasooriya, Uditha; Saw, L.C. Sutaip; Gadag, Veeresh (01-May-00)
- Run-Related Probability Functions Applied to Sampling Inspection - Shmueli, Galit; Cohen, Ayala (01-May-00)
- Design of an Advanced NP Control Chart - Wu, Zhang; Fan, Haitao (01-May-00)
- Bayesian Analysis of Quality Level Using Simulation Methods - Raghunathan, T.E. (01-Apr-00)
- 2(k-p) Experiments with Binary Responses: Inverse Binomial Sampling - Bisgaard, Soren; Gertsbakh, Ilya (01-Apr-00)
- Statistical Process Control in the Presence of Large Measurement Variation - Dechert, Jerry; Case, Kenneth E.; Kautiainen, Timothy L. (01-Mar-00)
- Demonstrating Deming's Rule using an Economic Model of the CSP-1 - Cassady, M. Richard; Maillart, Lisa M.; Rehmert, Ian J.; Nachlas, Joel A. (01-Mar-00)
- A Comparison of Three Methods for Selecting Values of Input Variables in the Analysis of Output from a Computer Code - McKay, M. D.; Beckman, R. J.; Conover, W. J. (01-Feb-00)
- Improving the Yield of Printed Circuit Boards Using Design of Experiments - Maruthi, B. N.; Joseph, V. Roshan (01-Dec-99)
- Economic Design of a Variable Sampling Rate X-bar Chart - Park, Changsoon; Reynolds, Marion R., Jr. (01-Oct-99)
- Joint X-bar and R Charts with Variable Sample Sizes and Sampling Intervals - Costa, Antonio F. B. (01-Oct-99)
- X-bar Charts with Variable Parameters - Costa, Antonio F. B. (01-Oct-99)
- Graphical Acceptance Sampling - Robinson, Lawrence W. (01-Sep-99)
- Estimating Sources of Variation: A Case Study from Polyurethane Product Research - Heaney, Michael D.; Lidy, Werner A.; Rightor, Edward G.; Barnes, C. Glenn (01-Sep-99)
- Sample Size Considerations for Assessing the Equivalence of Two Process Means - Stein, Jeff; Doganaksoy, Necip (01-Sep-99)
- Minimum AFI for CSP-1 Plan Under Markov Process - Chen, Chung-Ho; Wang, Reay-Chen (01-Jun-99)
- Effects of Dynamics on the Properties of Feedback Adjustment Schemes with Dead Band - Luce?o, Alberto; Gonzalez, Francisco J. (01-May-99)
- Robust Surveillance Plans for Monitoring Shelf Life of Systems with Degradation - Kramer, Stuart; Pohl, Edward; Neher, Robert; Smith, Ernest (01-Dec-98)
- Events Defined by Duration and Severity, With an Application to Network Reliability - Becker, Richard A.; Clark, Linda A.; Lambert, Diane (01-Aug-98)
- Discussion: Events Defined by Duration and Severity, With an Application to Network Reliability - Robinson, Jeff (01-Aug-98)
- Response: Events Defined by Duration and Severity, With an Application to Network Reliability - Becker, Richard A.; Clark, Linda A.; Lambert, Diane (01-Aug-98)
- Discussion: Events Defined by Duration and Severity, With an Application to Network Reliability - Schmee, Josef (01-Aug-98)
- Three Types of Producer's and Consumer's Risks in the Single Sampling Plan - Chun, Young H.; Rinks, Dan B. (01-Jul-98)
- A Bayesian On-Line Change Detection Algorithm with Process Monitoring Applications - Sarkar, Pradipta; Meeker, William Q. (01-Mar-98)
- Bayesian Computations for a Class of Reliability Growth Models - Erkanli, Alaattin; Mazzuchi, Thomas A.; Soyer, Refik (01-Feb-98)
- "We Have 95% Confidence That?" - Frank, Norman C. (01-Feb-98)
- Selecting Statistically Valid Sampling Plans - Taylor, Wayne A. (01-Dec-97)
- Sampling Properties of an Estimator of a New Process Capability Index for Weibull Distributed Quality Characteristics - Mukherjee, S.P.; Singh, N.K. (01-Dec-97)
- A Bayesian Variable-Selection Approach for Analyzing Designed Experiments With Complex Aliasing - Chipman, H.; Hamada, M.; Wu, C.F.J. (01-Nov-97)
- Sampling Plans for the Multivariate T2 Control Chart - Aparisi, Francisco (01-Sep-97)
- Early SQC: A Historical Supplement - Juran, J.M. (01-Sep-97)
- An Efficient Sampling Technique for Off-line Quality Control - Kalagnanam, Jayant R.; Diwekar, Urmila M. (01-Aug-97)
- Process Health Care: Prevention and Therapy - Bluvband, Zigmund; Grabov, Pavel (01-May-97)
- X-Bar Chart with Variable Sample Size and Sampling Intervals - Costa, Antonio F. B. (01-Apr-97)
- Control Charts Applying a Sequential Test at Fixed Sampling Intervals - Stoumbos, Zachary G.; Reynolds Jr., Marion R. (01-Jan-97)
- A Comparison of Operating Characteristics of the p-V and the p-Rp Charts - Quarshie, B.L.; Shindo, Hisakazu (01-Dec-96)
- Selecting Failure Monitoring Times for an Exponential Life Distribution - Shapiro, Samuel S.; Gulati, Sneh (01-Oct-96)
- Quick Switching Systems - Taylor, Wayne A. (01-Oct-96)
- Attributes Control Charts with Large Sample Sizes - Heimann, Peter A. (01-Oct-96)
- Eight Points for More Useful Surveys - Nogami, Glenda Y. (01-Oct-96)
- Bootstrap Control Charts - Wu, Zhang; Wang, QiNan (01-Sep-96)
- A Specific SPC Chart for Small-Batch Control - Pillet, Maurice (01-Jun-96)
- Zero Defect Sampling - Gookins, E.F. (01-May-96)
- Selecting Statistically Valid Sampling Plans - Taylor, Wayne A. (01-May-96)
- Exponential Probability of Defectives in Sampling - Castagliola, Philippe (01-May-96)
- Shewhart and EWMA Variable Sampling Interval Control Charts with Sampling at Fixed Times - Reynolds Jr., Marion R. (01-Apr-96)
- Reducing Sample Sizes of AAMI Gamma Radiation Sterilization Verification Experiments and Dose Audits - Phillips, George W.; Taylor, Wayne A.; Sargent, Harold E.; Hansen, Joyce M. (01-Mar-96)
- Bayesian Analysis of Ordered Categorical Data from Industrial Experiments - Chipman, Hugh; Hamada, Michael (01-Feb-96)
- Empirical Bayes Estimation of the Reliability of Nuclear-Power-Plant Emergency Diesel Generators - Martz, Harry F.; Kvam, Paul H.; Abramson, Lee R. (01-Feb-96)
- Column: Technical Aids: Notes on the Use of Randomization in Experimentation - Nelson, Lloyd S. (01-Jan-96)
- Variable Sampling Interval X Charts in the Presence of Correlation - Reynolds, Marion R.; Arnold, Jesse C. (01-Jan-96)
- Compensating for Inspection Errors in Attribute Inspection - Gramopadhye, Anand K.; Paijuri, Venue Gopal; Kimbler, Delbert; Ferrell, William G., Jr. (01-Dec-95)
- An Application of Variable Sampling Interval Control Charts - Baxley Jr., Robert V. (01-Oct-95)
- Probability Distributions for the Deming Cost Models - Kaminsky, Frank C.; Haberle, Katharine Rowse (01-Oct-95)
- Control Charting: Process Improvement Over Theoretical Elegance - Chirico, Anthony J. (01-Sep-95)
- Mood's Theorem, Deming's kp Rule, and the Death of Acceptance Sampling - Rigdon, Steven E. (01-Sep-95)
- Statistical Applications of a Metric on Subspaces to Satellite Meteorology - Crone, L. J.; Crosby, D. S. (01-Aug-95)
- A Comparison of Methods for Univariate and Multivariate Acceptance Sampling by Variables - Hamilton, David C.; Lesperance, Mary L. (01-Aug-95)
- A Control Chart for Attrubutes and Its Applications - Quarshie, Leonard B., Ph.D. (01-May-95)
- Solving Problems Through Inspection - Cullen, Frank; Carter, Chuck; Cook, Hardy M.; Dedhia, Navin; Gookins, Elmer; Vincent, Bob; Johnson, Bruce; Ward, Shirley (01-May-95)
- A Design Tool to Evaluate Average Time to Signal Properties of Adaptive X Charts - Prabhu, Sharad S.; Montgomery, Douglas C.; Runger, George C. (01-Jan-95)
- Column: Statistics Corner: Reliability Data Analysis. Part 4: Bootstrap Confidence Limits for the Product Limit Estimator - Gunter, Bert (01-Dec-94)
- Column: Statistics Corner: Reliability Data Analysis. Part 3: Classical Confidence Limits for the Product Limit Estimator - Gunter, Bert (01-Oct-94)
- Should Quality Be Designed In or Inspected In? A Cost-Of-Quality Framework - Radhakrishnan, Suresh; Srinidhi, Bin (01-Sep-94)
- Acceptance Sampling in the 90's - Taylor, Wayne A., Ph.D. (01-May-94)
- The Importance of Sampling in Inspection - Schilling, Edward G. (01-May-94)
- Ten Reasons Why Surveys Fail - Futrell, David (01-Apr-94)
- Report Card Issues in Quality Management - Marquardt, Donald W. (01-Apr-94)
- Measuring Customer Satisfaction in Business Markets - Hayslip, Warren R. (01-Apr-94)
- Estimation of Extreme Quantiles Based on Sensitivity Tests: A Comparative Study - Young, Linda; Easterling, Robert (01-Feb-94)
- Analysis of Weight Frequency Distributions Using Replicated Data - Lwin, Thaung (01-Feb-94)
- A Discussion of All-or-None Inspection Policies - Wiel, Scott Vander; Vardeman, Stephen (01-Feb-94)
- The Effect of Sample Size on Estimated Limits for and X Control Charts - Quesenberry, Charles (01-Oct-93)
- Are Acceptance Sampling and SPC Complementary or Incompatible? - Sower, Victor E.; Motwani, Jaideep; Savoie, Michael J. (01-Sep-93)
- Designing Process Capability Studies - Runger, George C. (01-Jul-93)
- Quick Switching Systems for Acceptance Sampling - Taylor, Wayne A. (01-May-93)
- Statistical Inference from Start-Up Demonstration Test Data - Viveros, Roman; Balakrishnan, N. (01-Apr-93)
- Continuous Process Improvement with Observational Studies - Hamada, M.; Mackay, R.J.; Whitney, J.B. (01-Apr-93)
- The (k1, k2) Game - Burke, Richard J.; Davis, Robert D.; Kaminsky, Frank C. (01-Feb-93)
- A Robustness Study of Charts with Variable Sampling Intervals - Amin, Raid; Miller, Richard (01-Jan-93)
- Conditional Resampling for Misclassified Multinomial Data With Applications to Sampling Inspection - Haitovsky, Yoel; Rapp, Joel (01-Nov-92)
- Bootstrap Technology and Applications - Lger, Christian; Politis, Dimitris; Romano, Joseph (01-Nov-92)
- The Implementation on Spreadsheets of Sampling Curves Associated With Acceptance/Rectification Plans - Cox, M.A.A. (01-Oct-92)
- Armor Acceptance Procedure - Baker, William; Thomas, Jerry (01-Oct-92)
- Program for Sequential Approach to Continuous Sampling - Goldberg, Gerald, Ph.D. (01-Jul-92)
- Estimating Nonconformance Rates After Zero-Defect Sampling With Rectification - Greenberg, Betsy; Stokes, S. Lynne (01-May-92)
- SPC Training and Decision Making with OC Curves - Burns, Clarence R. (01-May-92)
- Estimating Cpk Accuracy - Price, Barbara; Price, Kelly (01-May-92)
- Double Sampling Charts - Daudin, J.J. (01-Apr-92)
- Analysis of CUSUM and Other Markov-type Control Schemes by Using Empirical Distributions - Yachchin, Emmanuel (01-Feb-92)
- Standards, Sampling, and Schooling - Wareham, Ralph E.; Stratton, Brad (01-Dec-91)
- Deming Demystifies the "Black Art" of Statistics - Gabor, Andrea (01-Dec-91)
- Probability Limits on Outgoing Quality for Continuous Sampling Plans - McShane, Lisa M.; Turnbull, Bruce W. (01-Nov-91)
- Reliability Test Plans for One-Shot Devices Based on Repeated Samples - Bain, Lee; Engelhardt, Max (01-Oct-91)
- Combining Multilevel Sampling Plans and Personal Computers - Glaccum, John F. (01-Sep-91)
- How Can You Calculate Small Sample Probabilities Without Formulas? - Burr, John T. (01-Sep-91)
- Measurement Systems, Sampling, and Process Capability - McNeese, William; Klein, Robert (01-Jul-91)
- Is Sampling Really Dead? - Milligan, Glenn W. (01-Apr-91)
- A Sequential Approach to Continuous Sampling - Connolly, Cyril (01-Apr-91)
- Adaptive Sampling for Process Control - Runger, George; Pignatiello, Jr., Joseph (01-Apr-91)
- Column: Technical Aids: Power in Comparing Poisson Means: I. One-Sample Test - Nelson, Lloyd S. (01-Jan-91)
- Process Capability Estimates From Small Samples - Lewis, Sidney (01-Jan-91)
- SPC: What Data Should I Collect? What Charts Should I Use? - Mu?oz, Jairo; Nielsen, Chase (01-Jan-91)
- Adaptive Procedures for the Two-Stage Group-Testing Problem Based on Prior Distributions and Costs - Schneider, Helmut; Tang, Kwei (01-Nov-90)
- Bayesian Reliability Analysis of Complex Series/Parallel Systems of Binomial Subsystems and Components - Martz, H.F.; Waller, R.A. (01-Nov-90)
- The Effects of Inspection Errors on Acceptance Sampling for Nonconformities - Suich, Ron (01-Oct-90)
- Acceptance Control in a Modern Quality Program - Schilling, Edward (01-Oct-90)
- The Adjusted p Chart and u Chart for Varying Sample Sizes - Rocke, David (01-Jul-90)
- Unacceptable Root Cause Analysis Auditing - Kowalewski, Milton J.; Oberle, Ronald J. (01-May-90)
- Optimal Sampling Scheme for % (Percent) Chemical Content - Gunderson, Mark L. (01-May-90)
- A Nonparametric Bayes Empirical Bayes Procedures for Estimating the Percent Nonconforming in Accepted Lots - Martz, H.F.; Zimmer, W.J. (01-Apr-90)
- The Lognormal Distribution for Modeling Quality Data When the Mean is Near Zero - Albin, Susan L. (01-Apr-90)
- Improved Curtailed Sampling Plans for np Control Charts - Williams, William W.; Looney, Stephen W.; Peters, Michael H. (01-Apr-90)
- Oscilloscopes Display Test and Measurement Versatility - Crop, Roland (01-Feb-90)
- Estimating Outgoing Quality Using the Quality Measurement Plan - Brush, Gary G.; Hoadley, Bruce; Saperstein, Bernard (01-Feb-90)
- Factors Facilitating Statistical Process Control for Small Batch Sizes - Winchell, William; Millis, Lisa (01-Jan-90)
- Elements of Process Control - Schilling, Edward (01-Oct-89)
- Setting the Table for Multiple Test Controls - Kern, Carl (01-Sep-89)
- Column: One good idea: Is Acceptance Sampling in the Bag? - Browne, Joe (01-Aug-89)
- Interval Estimation Based on Censored Samples from the Weibull Distribution - Schneider, Helmut; Weissfeld, L.A. (01-Jul-89)
- A General Continuous Sampling Procedure for Resource-Limited Manufacturing Facilities - Sharp, Michael C.; Miller, Steven R.; Economou, John E. (01-Jul-89)
- Failure-Censored Variables-Sampling Plans for Lognormal and Weibull Distributions - Schneider, Helmut (01-May-89)
- Acceptance Sampling of Variables for Proportion of Defectives, Multivariable Case - Plesko, George A.; Vaks, Jeffery E.; Webb, M. Richard (01-Apr-89)
- Application of Statistical Inspection Technology to Construction Projects - Hansel, John L.; Christensen, Jon D. (01-Apr-89)
- A Simplified Markov Chain Analysis of ANSI/ASQC Z1.4 Used Without Limit Numbers - Brugger, Richard M. (01-Apr-89)
- Gaining Acceptance for Acceptance Sampling - Fitzsimmons, Dan K. (01-Apr-89)
- Bootstrap Methods for Testing Homogeneity of Variances - Boos, Dennis D.; Brownie, Cavell (01-Feb-89)
- Procedures and Tables for the Selection of CSP-1 Plans - Govindaraju, K. (01-Jan-89)
- Interval Estimation for Censored Accelerated Life Tests Based on the Lognormal Model - Schneider, Helmut; Weissfeld, Lisa (01-Jan-89)
- Column: Technical Aids: Upper Confidence Limits on Average Numbers of Occurrences - Nelson, Lloyd S. (01-Jan-89)
- Generalized Attribute Acceptance Sampling Plans - Nachlas, Joel A.; Kim, Seong-In (01-Jan-89)
- Normal and Binomial Selection Problems - Friedrichs, Michael D.; Guenther, William C. (01-Jan-89)
- A Three-Class Procedure for Acceptance Sampling by Variables - Newcombe, P.A.; Allen, O.B. (01-Nov-88)
- Economic Design of x-bar Control Charts Under Weibull Shock Models - Banerjee, P.K.; Rahim, M.A. (01-Nov-88)
- Estimating Nonconformity Rates in c-Defect Sampling - Zaslavsky, Alan (01-Oct-88)
- AOQ and AOQL for Stoplight Acceptance Sampling - Salvia, Anthony A. (01-Jul-88)
- Multiple Criteria Sampling Plans for Total Fraction Nonconformance - Danziger, Lawrence; Papp, Zoltan (01-Jul-88)
- Bayesian Reliability Analysis of Series Systems of Binomial Subsystems and Components - Martz, H.F.; Waller, R.A.; Fickas, E.T. (01-May-88)
- Estimating Average Outgoing Quality - Dehnad, Khosrow (01-May-88)
- Statistical Effects of Imperfect Inspection Sampling III--Screening (Group Testing) - Johnson, Norman L.; Kotz, Samuel; Rodriguez, Robert N. (01-Apr-88)
- Zero Acceptance Sampling Plans: Expected Cost Increases - Baker, R.C. (01-Jan-88)
- Allocating Observations in the Random Effects Balanced One-Way ANOVA - Pignatiello, Joseph J. Jr. (01-Oct-87)
- ANSI/ASQC Z1.4 Performance Without Limit Numbers - Grinde, Roger B.; McDowell, Edward D.; Randhawa, Sabah U. (01-Oct-87)
- Plans for Very Low Fraction Nonconforming - Pesotchinsky, Leon (01-Oct-87)
- Optimal Call-Record Sampling for Network Planning and Administration - Pack, C.D.; Saad, S.Ben (01-Aug-87)
- Monte Carlo Estimation Under Different Distributions Using the Same Simulation - Beckman, Richard J.; McKay, Michael D. (01-May-87)
- Large Sample Properties of Simulations using Latin Hypercube Sampling - Stein, Michael (01-May-87)
- Comparing k Independent Sample Means with a Known Standard - Mee, Robert W.; Shah, Arvind K.; Lefante, John J. (01-Apr-87)
- Performance of PRE-Control Sampling Plans - Salvia, Anthony A. (01-Apr-87)
- Multiple Attributes Sampling Acceptance Plans Involving Destructive Testing - Speevak, T.; Yu, A.K. (01-Feb-87)
- An Improved Estimator of the Mean for a Sequential Binomial Sampling Plan - Kremers, Walter K. (01-Feb-87)
- Estimating the Percent Nonconforming in the Accepted Product After Zero Defect Sampling - Hahn, Gerald J. (01-Jul-86)
- Statistical Effects of Imperfect Inspection Sampling: II. Double Sampling and Link Sampling - Johnson, Norman L.; Kotz, Samuel; Rodriguez, Robert N. (01-Apr-86)
- A Comparison of Classical and Bayes Producer's Risk - Brush, Gary G. (01-Feb-86)
- Computer Programs: A Program for Selecting Efficient Binomial Double Sampling Plans - Taylor, Wayne A.; Rodriguez, Robert N. (edited by) (01-Jan-86)
- Computer Programs: Computation of Some Common Discrete Distributions - Nelson, Peter R.; Policello, George E. (edited by) (01-Jul-85)
- The Deming Inspection Criterion for Choosing Zero or 100 Percent Inspection - Papadakis, Emmanuel P. (01-Jul-85)
- Column: Technical Aids: Sample Size Tables for Analysis of Variance - Nelson, Lloyd S. (01-Jul-85)
- Acceptance Sampling Plans for Materials in Bulk Form Using A Beta Model - Brown, G.H. (01-Jul-85)
- LQL Like Plans for Sampling by Variables - Guenther, William C. (01-Jul-85)
- Conditional Double Sampling by Variable - Rao, C.V. (01-Jul-85)
- The Breakdown Points of the Mean Combined With Some Rejection Rules - Hampel, Frank R. (01-May-85)
- Confidence Limits for Parameters of a Normal Distribution From Singly Censored Samples, Using Maximum Likelihood - Schmee, Josef; Gladstein, David; Nelson, Wayne (01-May-85)
- Rectifying Inspection for Nonconforming Items and the Hald Linear Cost Model - Guenther, William C. (01-Apr-85)
- Some Useful Notes on Simple Random Sampling - Wright, Tommy; Tsao, How (01-Apr-85)
- Approximately Optimal Narrow Limit Gages - Evans, I.G.; Thyregod, P. (01-Apr-85)
- Computer Programs: A Computer Program for the ASN of Curtailed Attributes Sampling Plans - Rutemiller, Herbert C.; Schafer, Ray E.; Policello, George E. (edited by) (01-Apr-85)
- The Performance of Variable Sampling Plans When the Normal Distribution is Truncated - Schneider, Helmut (01-Apr-85)
- Use of Curtained Sampling Plans in the Economic Design of np-Control Charts - Williams, William W.; Looney, Stephen W.; Peters, Michael H. (01-Feb-85)
- The Effects of Inspection Error on Double Sampling by Attributes - Maghsoodloo, S.; Bush, B.K. (01-Jan-85)
- Two-Sided Distribution-Free Tolerance Intervals and Accompanying Sample Size Problems - Guenther, William C. (01-Jan-85)
- Statistical Effects of Imperfect Inspection Sampling: I. Some Basic Distributions - Johnson, Norman L.; Kotz, Samuel; Rodriguez, Robert N. (01-Jan-85)
- Sample Size Determination--Revised and Simplified - Bryson, M.C. (01-Dec-84)
- Parts Per Million AOQL Sampling Plans - Cross, Robert (01-Nov-84)
- Estimation in Bernoulli Trials Under a Generalized Sampling Plan - Kim, Seong-in; Nachlas, Joel A. (01-Nov-84)
- Reviews of Standards and Specifications: Small Acceptance Number Plans for Use in Military Standard 105D - Liebesman, B.S.; Hawley, F.C.; Wadsworth, Harrison M. (edited by) (01-Oct-84)
- One-Sided Confidence Regions on the Upper and Lower Tail Areas of the Normal Distribution - Chou, Youn-Min; Owen, D.B. (01-Jul-84)
- The Effects of Variability in Inspector Error - Manzefricke, Ulrich (01-Jul-84)
- Reviews of Standards and Specifications: Which Sampling Plan Should I Choose? - Enell, John W.; Wadsworth, Harrison M. (edited by) (01-Jul-84)
- Computer Programs: Wald Sequential Sampling for Attribute Inspection - Garrison, David R.; Hickey, John J. (01-Jul-84)
- An Economic Attributes Acceptance Sampling Plan With Three Decision Criteria - Riew, Moon Charn; Bai, Do Sun (01-Jul-84)
- Removing the Effects of Measurement Errors in Constructing Statistical Tolerance Levels - Jeach, John L. (01-Apr-84)
- An Overview of Acceptance Control - Schilling, Edward G. (01-Apr-84)
- Tolerance Limits and Bounds for Proportions Based on Data Subject to Measurement Error - Mee, Robert W. (01-Apr-84)
- The Importance of Practice in the Development of Statistics - Box, George E.P. (01-Feb-84)
- Generating a Set of Interrelated Inspection Sampling Plans - Pugh, G. Allen; Elgomayel, Joseph I. (01-Jan-84)
- Determining Sample Size and Error for Attribute Sampling - Heyes, Gerald B. (01-Nov-83)
- The (Un)Usefulness of the Characteristic Value as an Acceptance Criterion - Booster, P. (01-Oct-83)
- Construction and Selection of Chain Sampling Plans ChSP-(0,1) - Soundararajan, V.; Govindaraju K. (01-Oct-83)
- Average Sample Number for Semi-Curtailed Sampling Using the Poisson - Guenther, William C. (01-Jul-83)
- Effect of Measurement Error and Instrument Bias on Operating Characteristics for Variables Sampling Plans - Owen, D.B.; Chou, Youn-Min (01-Jul-83)
- Double Sampling Based Upon Costs And Lot History - Chen, Shao-Shing; Case, Kenneth E.; Keats, John B. (01-May-83)
- Comprehensive Approach For Evaluating Acceptance Sampling Procedures - Zonnenshain, Avigdor; Dietrich, Duane L. (01-May-83)
- Variables Sampling--Free Information - Farrow, John H. (01-May-83)
- Quality Cost Breakthroughs In U.S. Production - Mundel, August B. (01-May-83)
- Trinomial Sampling Plans To Match MIL-STD-105D - Clements, John A. (01-May-83)
- QMP/ASP: A Modern Alternative to MIL-STD-105D - Buswell, George; Hoadley, Bruce (01-May-83)
- An Overview Of Acceptance Control - Schilling, Edward G. (01-May-83)
- Multivariate Acceptance Sampling Plans - Hansen, Edward R. (01-May-83)
- Counting a Large Number of Items Using the Weight of a Small Sample - Nelson, Peter R. (01-May-83)
- Graphical Analysis of Process Variation Studies - Snee, Ronald D. (01-Apr-83)
- Sample Sizes for Variables Sampling Plans Based on a Decision Theoretic Approach - Fertig, Kenneth W.; Mann, Nancy R. (01-Apr-83)
- Two New ASQC Acceptance Sampling Standards - Schilling, Edward G. (01-Mar-83)
- A Renewal-Process Approach to Continuous Sampling Plans - Yang, Grace L. (01-Feb-83)
- Confidence Intervals for a Binomial Parameter Following a Multistage Test With Application to MIL-STD-105D and Medical Trials - Jennison, Christopher; Turnbull, Bruce W. (01-Feb-83)
- A Comparison of Sample Sizes for the Analysis of Means and the Analysis of Variance - Nelson, Peter R. (01-Jan-83)
- Confidence Intervals for the Percent Nonconforming Based on Variables Data - Weingarten, Harry (01-Oct-82)
- Selecting an Acceptance Sampling Plan That Minimizes Expected Error and Sampling Cost - South, John B. (01-Oct-82)
- Sample Size Limit When Sampling From a Nonhomogeneous Mixture - Mehrez, Avraham; Stulman, Alan (01-Oct-82)
- Skip-Lot Is Not Optimal In the Case of Independent Fractions Defective--Comments on a Paper by Professor Hsu - Reimann, Axel (01-Oct-82)
- Sample Sizes for Prediction Intervals - Meeker, William Q., Jr.; Hahn, Gerald J. (01-Oct-82)
- Bounds for Correlated Compound Probabilities - Weed, Richard M. (01-Oct-82)
- Sampling Plan Adjustment for Inspection Error and Skip-Lot Plan - Carr, Wendell E. (01-Jul-82)
- Reviews of Standards and Specifications: Probabilities of Noncompliance for Sampling Plans in NBS Handbook 133 - Lauer, G. Nicholas; Godfrey, A. Blanton (edited by) (01-Jul-82)
- Computer Programs: An Algorithm for Determining Double Attribute Sampling Plans - Olorunniwo, Festus O.; Salas, Juan Raul; Nelson, Peter R. (edited by) (01-Jul-82)
- Expected Thruput: An Alternative Approach to Clerical Performance Measurement - Hailey, William A.; Ryan, Edward J. Jr. (01-Jul-82)
- What's New with MIL-STD 105D (ANSI-Z1.4 - 1980) - White, John S. (01-May-82)
- Risk & Human Resources Are Factors In Sampling - Mills, Chas. A. (01-May-82)
- Sampling When The Mean And Variance Are Important - Fyffe, David E. (01-May-82)
- Attributes Sampling For Multicharacteristic Items - Case, Kenneth E.; Ozaki, Shinya; Keats, John B. (01-May-82)
- Optimizing Sampling Plans Using Bimodal Fitting - Glaser, John H.; Rogers, Cephas B. (01-May-82)
- Minimum Sample Sizes For Hypergeometric Plans - Hailey, William A. (01-May-82)
- Minimizing the Cost of Inspection - Latzko, William J. (01-May-82)
- An ISO Proposal For Selecting A Sampling Plan - Mundel, August B. (01-May-82)
- Markovian Analysis Of Sequenced Sampling - Heaphy, Maureen S.; Gruska, Gregory F. (01-May-82)
- Selecting Sampling Procedures Can Be Fun - Breeze, John D.; Heldt, John J. (01-May-82)
|