Stage 3: Designing the Processes and Outputs (Deliverables)
When the project is approved, the project team proceeds with the content design and with the procurements needed to implement the project.
The design process includes defining:
- Measurements.
- The monitoring method.
- Status reporting protocols.
- Evaluation criteria.
- Design of the ultimate processes and outputs.
- Implementation schedules.
Stage 4: Implementing and tracking the project.
|