Select another topic:
Process Capability
|
|
|
Articles
- Practical Statistical Process Control for Software Metrics - Manlove, Diane; Kan, Stephen H. (01-Sep-07)
- One Good Idea: Under One Roof - Sedlock, Ronald (01-Jul-07)
- Attribute Risk and Process Performance Metric Relationships - Houston, Ben F. (01-Nov-06)
- International Outsourcing: Value vs. Economics - Elliott, George C. (01-Aug-06)
- Design Evaluation of Air Gap in a Ceiling Fan - A Simulation Case Study - Tridib, K. Dutta (01-Jul-06)
- Effect of Testing Normality on Estimating Process Capability Indices - Han, C.-P. (01-Jul-06)
- Assessing Capability for Hole Location - Bothe, Davis R. (01-Jul-06)
- Supplier Selection Based on Process Capability and Price Analysis - Linn, Richard J.; Tsung, Fugee; Ellis, Lau Wai Choi (01-Apr-06)
- Quantitative Techniques to Evaluate Process Stability - Ramirez, B.; Runger, G. (01-Jan-06)
- Capability Index for Relational Functions: Inferential Procedures - Bulba, Edivaldo A.; Ho, Linda Lee (01-Jan-06)
- Promoting Customer Satisfaction by Applying Six Sigma: An Example from the Automobile Industry - Chen, S.C.; Chen, K.S.; Hsia, T.C. (01-Oct-05)
- A Wald Test for Comparing Multiple Capability Indices - Hubele, Norma F.; Berrado, Abdelaziz; Gel, Esma S. (01-Oct-05)
- Quantile-Based Metrics Applied to Process Performance - Houston, Ben F. (01-Oct-05)
- Developing Control Measures to Reduce Variation in Weight of Packed Cement Bags - Das, Prasun (01-Oct-05)
- Practical Implementation of the Capability Index C(pk) Based on the Control Chart Data - Lin, Hung-Chin; Sheen, Gwo-Ji (01-Jul-05)
- Algebraic Relationship Between Symmetrical and Asymmetrical Capability Indices - Grau, Daniel (01-Jul-05)
- Capability Indexes: Mystery Solved - Roth, Gregory (01-May-05)
- Improving Process Capability of Manufacturing Process by Application of Statistical Techniques - Gijo, E.V. (01-Apr-05)
- Two Steps To Making Informed Decisions - Vasquez, Cesar A. (01-Feb-05)
- Learning by Doing: A Series of Hands-On Projects for SPC - Hart, Marilyn (01-Jan-05)
- Evaluation of Nonnormal Process Capability Indices Using Generalized Lambda Distribution - Pal, Surajit (01-Jan-05)
- Index C*(pm) in Multiple Response Optimization - Ch'ng, C.K.; Quah, S.H.; Low, H.C. (01-Jan-05)
- Using Confidence Intervals to Compare Process Capability Indices - Daniels, Lorraine; Edgar, Byron; Burdick, Richard K.; Hubele, Norma Faris (01-Jan-05)
- Effective Process Management - Janitz, Mikel (01-Dec-04)
- Project Leads to $1.65 Million Annual Savings - Dev, Soumish (01-Nov-04)
- Build a Usable Process Capability Database - Thornton, Anna (01-Aug-04)
- Comparing the Capability of Two Processes Using C(pm) - Chen, Jann-Pygn; Chen, K.S. (01-Jul-04)
- Observational Study in a Semicontinuous Polymer Process - Ashayeri, A.; Degreve, J. (01-Jun-04)
- Characteristic Management and Other Missing Links - Reid, Daniel (01-May-04)
- Estimating Sensitivity of Process Capability Modeled by a Transfer Function - Bowman, Alan; Schmee, Josef (01-Apr-04)
- Quality Improvement Under Budgetary and Life-Cycle Constraints - Neureuther, Brian D.; Kenyon, George N. (01-Apr-04)
- Make Work Cells Work for You - Schonberger, Richard J. (01-Apr-04)
- The Effect of Pooled and Un-pooled Variance Estimators of C(pm) When Using Subsamples - Hubele, Norma Faris; Vannman, Kerstin (01-Apr-04)
- The Quality of Learning - Chambers, David W.; Fernandez, Abel A. (01-Mar-04)
- Failure Amplification Method: An Information Maximization Approach to Categorical Response Optimization (And Subsequent Discussions) - Joseph, V. Roshan; Wu, C.F. Jeff; (Leitnaker, Mary G.; Mee, Robert W.; Meeker, William Q.; Escobar, Luis A.; Miyakawa, Masami; Nair, Vijayan; Wang, Xiao; Sudjianto, Agus; ) (01-Feb-04)
- Optimum Mean Location in a Poor-Capability Process - Ho, Linda Lee; Quinino, Roberto C. (01-Dec-03)
- Modified Nominal/Target Control Charts A Case Study in Supplier Development - Vermani, S.K. (01-Oct-03)
- The Ins and Outs of Process Positioning - Lim, Sang-Gyu (01-Aug-03)
- Capability Analysis of Complex Parts - Vermani, S.K. (01-Jul-03)
- Bootstrap Confidence Limits for Short-Run Capability Indices - Balamurali, S. (01-Jun-03)
|
|