Quality Auditor Certification
Study Guide
- During the course of a 10-day system audit, when should the auditee be briefed?
- Every day
- Every other day
- As requested by the auditee
- At the beginning and the end of the audit
- Which of the following factors related to scheduling would most directly affect the performance of an audit?
- The client's company policy
- The scope of the audit
- The auditee's annual business plan
- The evaluation of corrective action
- A quality audit observation is defined as
- a noted item of objective evidence found during an audit
- an accepted level of audit findings defined as "major" and "minor"
- an auditor's initial notice of a potential nonconformance
- the lead auditor's perception of a potential problem
- The most important objective in the development of a supplier evaluation system is to reduce
- the number of suppliers
- the number of audit hours
- inspection at the customer site
- inspection at the supplier site
- Which of the following is the most useful graphical tool for promoting an understanding of process capability?
- A flowchart
- A histogram
- An affinity diagram
- An Ishikawa diagram
- Which of the following best describes quality control?
- The overall intentions and directions of an organization with regard to quality, as formally expressed by top management
- The activities that establish the objectives and requirements for quality and for the application of quality system elements
- The organizational structure and the procedures, processes, and resources needed to implement quality management
- The operational techniques and activities that are used to fulfill requirements for quality
- Auditors who audit outside their own country should be familiar with
- their own biases
- the auditee's attitude
- industry practices at the audit site
- the local customs at the audit site
- Which of the following is a benefit of performing a systems audit of a current supplier?
- Identifying the supplier's potential capability
- Assuring the supplier's capability
- Determining whether the company should do business with the supplier
- Evaluating continuing conformance to quality standards
- Which of the following is an example of a short-term corrective action?
- Improving process capability
- Analyzing a field failure
- Obtaining missing signatures on a purchase order
- Correcting the problem of obsolete drawings
- Which of the following methods can an audit program manager use to establish consistency among auditors?
- Develop performance appraisals for all auditors
- Assign auditors to permanent audit teams
- Require auditors to read audit journals and references
- Require auditors to develop their own procedures manual
- Which of the following is most likely to request an audit?
- An auditee
- A client
- A company's audit department
- A company's supplier audit group
- Typically, which two of the following are more important to an auditor in maintaining his or her auditing competency?
| I. |
Understanding current standards for quality systems |
| II. |
Attending audit closing meetings |
| III. |
Networking with other auditors and auditing organizations |
| IV. |
Learning about changes to existing auditing techniques |
- I and II
- I and IV
- II and III
- III and IV
- When should audit checklists be prepared?
- At the time the audit is requested
- When the lead auditor is appointed
- During the opening meeting
- Before the field work is begun
- Quality auditors help companies improve their processes, products, and services by
- developing more comprehensive checklists
- guaranteeing product quality
- recommending better techniques for motivating employees
- reporting positive as well as negative evaluation results
- Communication by telephone is likely to be most effective when it is used for
- performing assessments
- corroborating information
- meeting random sampling requirements
- assessing the adequacy of a written form
- Sampling procedures used in audits are designed to
- verify the scope of an audit
- corroborate audit findings
- conserve time in data collection
- verify that all checklist items have been completed
- Management of an internal audit program should consider all of the following EXCEPT
- taking ownership of the quality assurance program
- supporting company objectives, goals, and strategies
- assuring that audits are a means to evaluate company performance
- weighing costs versus benefits of conducting an audit
- The type of chart that presents the value of items in descending order is a
- histogram
- Pareto chart
- u chart
- cusum chart
- Recognizing the need for a follow-up audit is the responsibility of the
- lead auditor
- corrective action team
- client
- auditee
- Measures of which of the following provide attributes data?
- Temperature in degrees
- Attendance at meetings
- Weight in pounds
- Length in metric units
- When an internal audit program is being formulated, the auditees' anxiety about the audit process is most likely to be reduced by which of the following?
- A cooperative process for involving participants in the development of audit procedures
- A clear description of the rules developed by the auditing group
- Clearly stated provisions for performing unannounced audits
- Clearly stated procedures for resolving audit findings
- The main purpose for conducting an opening meeting for an audit is to
- clarify the audit objectives
- discuss previous audit results
- develop audit criteria
- establish the scope of the audit
- A cause and effect diagram is a useful tool for doing which of the following?
- Determining the flow of a process
- Detecting shifts in a process
- Developing theories based on symptoms
- Arranging theories by defect count
| Answers: |
| 1. a |
6. d |
11. b |
16. c |
21. a |
| 2. b |
7. d |
12. b |
17. a |
22. a |
| 3. a |
8. d |
13. d |
18. b |
23. c |
| 4. c |
9. c |
14. d |
19. a |
|
| 5. b |
10. a |
15. b |
20. b |
|
Return to "Prepare for the exam."
|